
N52 Mullingar Bypass
| Local Authority: | Westmeath County Council |
| Start County: | Westmeath |
| End County: | Westmeath |
| Description: | Standard single carriageway of 4.9 km in length consisting of a 3.2 km North-South connection between the N52 Mullingar-Belvedere scheme and an existing roundabout in Marlinstown which is located just off the existing N4 Mullingar Bypass, together with a 1.7 km East - West link to the existing N52 in Lynn south of Mullingar. The scheme includes two bridges, one over the Royal Canal and a second over the Dublin-Sligo railway line. The scheme was officially opened on 4th August, 2006.
This project has been funded by the Irish Government under the National Development Plan and Transport 21. |
| Mainline Length (km): | 4.9 |
| Contractor: | Noel Regan & Son |
| Current Project Phase: | Complete |
